Aston Villa Football Club

Requirement:Slip-resistant steps to stand the test of time and heavy-duty foot traffic
Product: Degafloor Quartz Trowelled with Aggregate System
Colour:Bespoke Terracotta Quartz

Aston Villa Football Club

Slip-resistant steps for Villa Park

Degafloor were thrilled to be involved in the redevelopment of Aston Villa’s famous Villa Park football stadium. Slip-resistant steps were required for the Holte End of the stadium in addition to new facilities, including a new bar and suite complex.

As part of the project, slip-resistant steps were required that could hold up to the club’s large number of supporters and visitor foot traffic. The entire 600m² staircases were treated with Degafloor concrete crack seal, followed by a flexible waterproof membrane to deliver an impervious solution to protect the new bar and suite complex. The slip-resistant steps were then finished with a bespoke Degafloor Quartz Trowelled with Aggregate System, finished in a unique Terracotta Quartz.

To comply with current DDA legislation (Disability Discrimination Act) the slip-resistant steps were finished with a separately formed nosing in a white colour to help distinguish the edging and shape of each step.

Due to the tight project timescale and to overcome traditional British weather constraints, Flo-Dek (UK) Ltd recommended a range of fast curing Degafloor resin systems. As well as being fast curing, all Degafloor systems exhibit excellent UV resistance – essential for external environments – whilst the QTA system applied to the treads offers unrivalled slip resistance to ensure spectator safety, whatever the weather conditions.

To view the technical details of Degafloors products, you can download any of the Datasheets here.

Speaking on behalf of Flo-Dek (UK) Ltd, Sales Director Dave Cope said, “This was a very complex and demanding project. The colours had to match perfectly and the hand-formed nosings required a high level of skill and attention to detail”.

Click here to view more work by Degafloor.

This was a very complex and demanding project. The colours had to match perfectly and the hand formed nosings required a high level of skill and attention to detail

- Dave Cope, Flo-Dek (UK) Ltd