Puredrive

Client: Puredrive
Location: Corby, Northants


Installation

Puredrive Ltd of Corby needed to fully refurbish the flooring within 4 blast freezers and the surrounding lobby area. The flooring also needed to withstand thermal shock as the lobby area also contained a steam oven.

Working in close association with the client, Degafloor installation partner The National Flooring Company Limited assessed the situation and proposed a carefully managed programme of works to dry out the floor slab and overcoat. Following careful planning, a 4mm Degafloor FB system was installed throughout the entire area.

Degafloor slip resistant flooring at Puredrive Degafloor fast curing resin flooring at Puredrive

Why Degafloor?

To minimise disruption to standard operations, Puredrive needed to refurbish the flooring as quickly as possible, so the two hour cure time of Degafloor was a real advantage. Additionally, the client needed a
durable, seamless and slip resistant finish that could withstand the challenging operating conditions. The Degafloor FB system met all of Puredrive’s criteria .

< Back to Case Studies